Case Study: Reconstruction of Changjiji Bazam
Executive Summary: The reconstruction of Changjiji Bazam (Traditional Bridge) aimed to restore the damaged bridge…
Executive Summary: The reconstruction of Changjiji Bazam (Traditional Bridge) aimed to restore the damaged bridge…
Removal of formwork is also known as stripping or strike-off formwork. This should be done only after the concrete has gaining the sufficient amount of strength. When stripping of formwork, the concrete is subjected to double the stress before the removal of formwork.
Every construction work needs some temporary structure called Formwork to pour concrete to form the…
Knowing about cement is a must for engineers for the matter of construction and designing…
Laying of bricks, and tiles and giving wall finishing isn't complete without the binding materials…
In every construction project, there are typically civil and electrical works involved and occasionally mechanical…
Sewage from the latrines must be treated at every level of the community to prevent…